000 01762cam a2200361 a 4500
001 15317377
005 20090831144829.0
008 080605s2009 njua 001 0 eng
906 _a7
_bcbc
_corignew
_d1
_eecip
_f20
_gy-gencatlg
925 0 _aacquire
_b2 shelf copies
_xpolicy default
955 _ejg12 2008-06-05
_flg13 2008-09-02 Z-CipVer;
_glg13 2008-09-02 to BCCD
010 _a 2008024948
020 _a9780135137826 (alk. paper)
020 _a0135137829 (alk. paper)
035 _a(OCoLC)ocn231164375
035 _a(OCoLC)231164375
040 _aDLC
_cDLC
_dDLC
050 0 0 _aTH438.4
_b.N48 2009
082 0 0 _a690.068/5
_222
100 1 _aNewitt, Jay S.
245 1 0 _aConstruction scheduling :
_bprinciples and practices /
_cJay S. Newitt.
250 _a2nd ed.
260 _aUpper Saddle River, N.J. :
_bPrentice Hall,
_cc2009.
300 _axxi, 361 p. :
_bill. ;
_c24 cm. +
_e1 CD-ROM (4 3/4 in.)
500 _aIncludes index.
650 0 _aConstruction industry
_xManagement.
650 0 _aBuilding
_xSuperintendence.
650 0 _aProduction scheduling.
856 4 1 _3Table of contents only
_uhttp://www.loc.gov/catdir/toc/ecip0820/2008024948.html
999 _c72655
_d72655